Healing School

back

Location: Healing School, Grimsby
Client: AMS Accommodation Ltd.
Sector: Education
Modules: 4 no. 9.6m x 3m modules
Fall of ground: 400mm over 9.6m

To assist with ground bearing pressure on this very wet site, the Jackpads were positioned on a 600mm x 600mm x 300mm of compacted type 1 hardcore.

MPBA and LABC logo's