New Rush Hall School
Location: New Rush Hall School, Ilford, Essex
Client: Modular Direct
Sector: Education
Modules: 9 no. modules of varying sizes
Fall of ground: 900mm over 27.2m
This building had a traditional pitched roof necessitating increase of certain Jackpad positions where imposed loads exceeded 48kN. Placing the Jackpads directly onto the tarmacadam playground surface alleviates the need for reinstatement if the modules are removed.








